QNP AS9100 Main Index
|

Verification
of Purchased Product |
Verification of Purchased Product:
OP-743-01 Revision C
Effective Date:12/21/2011
Owner Approval by Barry Ralston, Vice President, on 12/21/2011
Management Approval by Craig O. Garneau, President, on 12/21/2011
Printed copies of this document are for information
purposes only and are uncontrolled. Printed copies are not
valid after the date of printing. This document was printed
on
|
- PURPOSE
| To provide a consistent
process for the inspection of purchased product to ensure that it
meets specified purchase requirements. |
- RESPONSIBILITY
The table below identifies
the people and their responsibility relating to this
procedure:
Person |
Responsibility |
Receiving
Personnel
Shipping
Clerks |
Receive incoming material
and supplies.
Inspects shipment upon
arrival for damage in transit.
Identify shipments
with Material Control Labels, FM-743-01 as necessary. |
Department
Supervisors
Stock Department
Personnel |
Verify Bill of Lading
against Purchase Order.
Move material to
department inventory/storage area.
Inspect material when
containers are opened for first use. |
Department
Supervisors
Accounting
Personnel
Quality Assurance
Personnel |
Contact
Vendor/Subcontractor when there is a
discrepancy/nonconformance in the contents of a
shipment. |
- APPLICABLE FORMS OR REFERENCES
The table below identifies
the number and the title of the forms and references that are
applicable to this procedure;
- POLICIES
- QNP is responsible for ensuring that purchased product meets specified purchase requirements. Verification methods may include;
- Obtaining objective evidence of product quality from suppliers, i.e. certificates of conformity, or test records.
- Inspections or audits of supplier's facilities
- Reviewing required documentation or certifcations
- Inspection of product upon receipt or upon first use,
- or delegating the verification to the supplier, or a supplier cert.
- Due to the nature of
materials/supplies used in the production of customer orders,
QNP does not inspect an incoming shipment until the container
is opened for the first use of the materials/supplies.
- Purchased product should not be used or processed until it has been verified as conforming to specified requirements unless it is released under a positive recall procedure.
|
- When QNP uses test reports to verify purchased product, the data in the reports is acceptable per applicable specifications.
- If QNP chooses to delegate veritication activities to a supplier, the requirements for delegation will be defined and a register maintained.
- If QNP or one of QNP's customers intend to perform verification as a supplier's facilities, QNP shall specify all arrangements in our purchasing documents.
- When required by contract, QNP's purchasing information specifies that our customer or customer's representative be given the right to verify at the supplier's facilities to ensure that subcontracted product conforms to specified requirements.
- Verfication by our customers is not considered evidence of effective quality control of our supplies, nor does it absolve QNP of the responsibility to provide acceptable product.
- Products received for the
Thermaplot, Markem, and Laminate/Adhesive Departments are not
marked with a Material Control Label, FM-743-01. Rolls of
materials and foils are sufficiently identified by the
information pre-printed on the product. Visual inspection is
sufficient to determine that product is suitable for use.
Reference: OP-753-01
Identification and
Traceability
- Department supervisors
organize their stock and maintain inventory in such a way to
practice first in/first out procedures.
- The results of an inspection
when a container is first opened for use of its contents is
recorded on FM-743-01, Material Control Label and is attached
to the container.
- Records of received materials are maintained within the purchasing database that contains purchase order history.
- Shipments received in
the shipping department are recorded in a notebook called the Shipping Department
Receiving Log. This log contains the date received, supplier name, and shipment method. The purpose of this log is to track incoming packages only, it does not record or provide evidence that any incoming product meets purchase requirements or is acceptable for use.
|
- PROCEDURE
Receiving Inspection at QNP
involves the following individual procedures:
5.1 Receiving of Material/Supplies in the Stock Department
5.2 Receiving of Material/Supplies in the Shipping Department
5.3 Inspection of Material/Supplies
5.1
Receiving of Material/Supplies in the Stock
Department
Use the steps in the table
below when receiving material/supplies in the stock
department.
|
Step
|
Action |
Person(s)
Responsible |
|
1.
|
Perform visual inspection
of material/supplies arriving at the loading dock prior
to unloading shipment.
- Damage to
containers
- Other
|
Receiving
Personnel |
|
2.
|
Has damage to
material/supplies that occuring in transit rendered the
shipment unusable?
- If yes, go to step
3
- If no, go to step
5
|
Receiving
Personnel |
|
3.
|
Notify Supervisor who is
responsible for purchasing the material. Record
non-conformance and refusal of shipment on purchase order or purchasing requisition for supplies. |
Receiving
Personnel |
|
4.
|
Refuse shipment by
notifying vendor and returning
materials/supplies.
Procedure ends
here. |
Receiving
Personnel |
|
5.
|
Unload shipment
from carrier vehicle. |
Receiving
Personnel |
|
6.
|
Access Bill of Lading
and/or Packing Slip accompanying shipment. |
Receiving
Personnel |
|
7.
|
Use the Bill of Lading
and/or Packing Slip and/or Package label to enter the
following information on Material Control Label, FM-743-01:
- Material
- Description
- Alloy
- Size
- Supplier
- PO#
- Date
Received
- Expiration
Date
- Received
By
- Heat, Lot, or Coil Number is appropriate
- Other
|
Receiving
Personnel |
|
8.
|
Make completed Material
Control Labels for each container in the shipment and
attach to each container in the shipment. |
Receiving
Personnel |
|
9.
|
Forward Bill of Lading
and Packing Slip to the Department Supervisor who ordered
the material/supplies. |
Receiving
Personnel |
|
10.
|
Set material aside for
further processing by the Department Supervisor who
issued request to order material. |
Receiving
Personnel |
|
13.
|
Send the following to the
Accounting Department:
- Receiving copy of
Purchase Order
- Bill of
Lading
- Packing
Slip
|
Department
Supervisor |
|
14.
|
Move material to
department inventory/storage area. |
Department
Supervisor
Fork Lift
Operator
Receiving
Personnel |
5.2
Receiving of Material/Supplies in the Shipping Department
Use the steps in the table below when receiving
material/supplies in the shipping department.
|
Step
|
Action |
Person(s)
Responsible |
|
1.
|
Material/Supplies
arrive in the shipping department |
Carrier; UPS,
FedX, etc. |
|
2.
|
Sign for packages
received in acceptable condition |
Shipping Clerk |
|
3.
|
Log packages in the
Shipping Department Receiving Log. Note the
delivery date, supplier, number of packages and delivery
method. |
Shipping Clerk |
|
4.
|
Use shipping label,
packing slip, or experience to deliver packages to the
correct department or personnel. |
Shipping Clerk |
|
5.
|
Label or identify the
received product as appropriate. |
Department Supervisor who
ordered material/supplies. |
|
6.
|
Access receiving copy
Purchase Order.
Reference: OP-741-01,
Purchasing |
Department
Supervisor |
|
7.
|
Verify information on
Bill of Lading/Packing Slip against the QNP Purchase
Order. |
Department
Supervisor |
|
8.
|
Initial QNP Purchase
Order and indicate quantity received. |
Department
Supervisor |
|
9.
|
Send the following
to the Accounting Department:
- Receiving copy of
Purchase Order
- Bill of
Lading
- Packing
Slip
|
Department
Supervisor |
5.3 Inspection of Materials
Use the steps in the table below when inspecting at the time
that the contents of the container are first used.
|
Step
|
Action |
Person(s)
Responsible |
|
1.
|
Container opened
for first use of material/supplies. |
Department
Supervisor
Stock Department
Personnel |
|
2.
|
Inspect material in
container against information on Material Control
Card, FM-743-01, attached to Container:
- Type of
Material
- Thickness
- Finish
- Suitability for
Printing
- Other
|
Department
Supervisor
Stock Department
Personnel |
|
3.
|
Ask: Is the material
acceptable?
- If YES, go to Step
5.
- If NO, go to Step
4.
|
Department
Supervisor
Stock Department
Personnel |
|
4.
|
Handle Material as
Nonconforming Product.
Reference: OP-830-01
Control of Nonconforming Product |
Department
Supervisor
Stock Department
Personnel |
|
5.
|
Record results of
Inspection in space provided on Material Control
Label,
FM-743-01 attached to container:
|
Department
Supervisor
Stock Department
Personnel |
|
- RECORDS/OBJECTIVE EVIDENCE
The retention duration for records referenced in this procedure are available on-line in the FM-423-01
Master Document List with Revision
History.
Records are maintained in accordance with OP-424-01
Control of Quality Records.
- REVISION HISTORY
Revision, approved date,
effective date, and a document change summary for this document is
located on-line in the FM-423-01
Master Document List with Revision
History.
|